+48 501 075 375

Call us

Strzelecka 1, Świebodzin

Visit us

Przytoczna Investment

Previous slide
Next slide

Project details

Investment plot in Przytoczna is a 30 ha lot, located 6 km from S3 Skwierzyna junction.

Area is located directly by the national road no. 24 from Gorzów Wielkopolski to Poznań. An additional advantage of the plot is direct access to the railway siding since the area is adjacent to the liquid gas bottling plant. Objectives of the plan include construction of over 100000 m2 of industrial buildings with options for production and storage. One of planned buildings above is a production hall with an area of 28000 m2. Distance from a planned industrial park to the Ławica-Poznań airport is 85 km and 220 km to the Berlin Tegel airport.

Latest Developments

Skwierzyna

Production and logistics hall

Nowa Sól

Production hall

Gubin

Installation design

Scroll to Top