Skwierzyna Investment

Previous slide
Next slide

Project Details

BTS Investment for the customers established in 6 months

Skwierzyna Park is a location with significant human capacity located 1.5 km from S3 junction – Skwierzyna. The development included two buildings with total area of 12000 m2. Major advantage of this location is the availability of highly qualified staff and direct connection by express road with Gorzów Wielkopolski and Międzyrzecze. Currently, the building „C” with total area of 10000 m2 is under construction.

Technical specification

Location

Skwierzyna is a city with 14000 inhabitants located 30 km from Gorzów Wielkopolski. It is located directly by S3 express road, recently put into operation. Location potential is constituted by the employees who, scattered across the region, are eager to take up employment in their place of residence.

Specialized equipment

Completed projects include high-quality buildings adjusted to needs of tenants with special fire protection installation and recuperation system.

Latest Developments

Świebodzin Zachód

Production and logistics hall

Nowa Sól

Production hall

Gubin

Installation design
Scroll to Top

Contact Form