Świebodzin Zachód Investment
Project details
- Investment takes up a total space area of 11800 m2 indoors.
- Berlin-Schönefeld Airport: 160 km
- Poznań-Ławica Airport: 103 km
- A2 / S3 Junction: 16 km
BTS Investment for the customers established in 6 months
A representative façade of the office building enables underlining prestige of the company and presents quality of the investment at first glance. Building is a dedicated investment tailored to customer’s needs conducted during consultation and in accordance with the tenant’s requirements.
Technical specification
- LED lighting
- Dust-free flooring
- Sprinkler system
- Docks with security flanges and hydraulic lifts
- Natural lighting and smoke dampers
Lighting
There’s a natural lighting in the hall because of the skylights in the roof in the form of 12% natural light. Moreover, modern installation system allows for conducting recuperation process in the form of regaining thermal energy from production process and using it for room heating in the building.
Additional equipment
The type of produced goods in the building requires a special fire protection system meeting the conditions of obtaining a certificate confirming high level of fire protection.